Quito, capital of Ecuador We’ve outran our competitors in a landslide victory during the selection process of project contractor through an open bid, and we’ve composed a consortium with the Office of Supply and established a local corporation in 2007. Securing a beachhead in South America where there’s infinite potential for growth has significant meaning.
|
|
| Status of public transportation |
1.Bus stops: 51 2. Number of buses : Trolebus (Central lane bus 113, Transit bus 99) 3. Population using bus : 2.1 million per day (220 thousand per day for project subject company) 4. For each bus type - Ecobia (78), Central (208), Metropolitanas (unconfirmed), Armarilia (unconfirmed), general bus (2,824)
|
 |
| Purpose of system introduction |
1. Management efficiency of transportation companies - Prevention of negative omission of earnings by
installing integrated fare collector and DVR in buses
- Securing management transparency of transportation companies through computerization of earnings and by
providing analysis report
- Reduction of operation (fare collection, cash counting) expenses through system introduction
2. Enhancement of bus usage service - With the usage of transportation cards and with the automatic change return function, it provides convenience in
the fare payment process.
- Provides bus stop guide broadcast in the bus
- Improves punctuality of a bus through LBS service provision
3. Advanced bus operation management - Efficient allocation management through real-time location tracking of vehicles and control
- Securing video when sudden occasion occurs and securing evidence on operation records
- By providing various statistical data related to operation records, it can be reflected in transportation policies
|
| System composition |
        |
 
|
1. Bus System: Driver’s terminal, integrated fare collector (card/cash), bus gate, DVR, bus sensor module 2. Transportation Company System: Summing system, DVR system 3. Central System: Transportation card loading device, ID change/return system, issuing system, loading system, fare adjustment system loading system, settlement system 4. LBS System: LBS system, control center 5. ETC.(transportation card) : Transportation card (supplied 1 million of 3 types of general, discount, and free of charge)
|
| Project promotion progress |
|
ㆍ2006. 08 Participated in the biding of Ecuador’s capital Quito's main bus route Trolebus system |
|
ㆍ2006. 10. 03 Selected as the priority bidder in the biding of Ecuador’s capital Quito's main bus route
Trolebus system |
|
ㆍ2006. 10~11 Negotiated on cost, period, and charge rate for establishment of project |
|
ㆍ2006. 12 Signed a pre-agreement for project (pre-negotiations on establishment details and charge rate) |
|
ㆍ2007. 02 Proceeded with discussions on contents of main agreement |
|
ㆍ2007. 04. 17 Signed main agreement |
|
ㆍ2008. 02 Currently going through inspection for the final opening |
|
|
| |
 |
| This project was signed as a contract ad libitum with Ecuador’s 3rd major city Cuenca which has been stimulated by Quito’s installment of an advanced transportation system under the recognition of eB’s credibility and specialty. |
|
| Status of public transportation |
1. Number of buses : 475 general buses 2. Population using public transportation on a daily basis : Minimum 400,000 people per day
|
 |
| Purpose of system introduction |
1. Management efficiency of transportation companies - Prevention of negative omission of earnings by
installing integrated fare collector and DVR in buses
- Securing management transparency of transportation companies through computerization of earnings and by
providing analysis report
- Reduction of operation (fare collection, cash counting) expenses through system introduction
2. Enhancement of bus usage service - With the usage of transportation cards and with the automatic change return function, it provides convenience in
the fare payment process.
- Provides bus stop guide broadcast in the bus
- Improves punctuality of a bus through LBS service provision
3. Advanced bus operation management - Efficient allocation management through real-time location tracking of vehicles and control
- Securing video when sudden occasion occurs and securing evidence on operation records
- By providing various statistical data related to operation records, it can be reflected in transportation policies
|
| System composition |
        |
 
|
1. Bus System: Driver’s terminal, integrated fare collector (card/cash), bus gate, DVR, bus sensor module 2. Transportation Company System: Summing system, DVR system 3. Central System: Transportation card loading device, ID change/return system, issuing system, loading system, fare adjustment system loading system, settlement system 4. LBS System: LBS system, control center 5. ETC.(transportation card) : Transportation card (supplied 1 million of 3 types of general, discount, and free of charge)
|
| Project promotion progress |
|
ㆍDue to shortening of operation opening day, the production and distributional shipping work of fare collection
system’s equipment has been completed until March 2008. |
|
| ㆍWe are pushing forward aiming to open in May. |
|
|
|